Las Vegas Day Club (TAO Beach)
Las Vegas Day Club (TAO Beach)
CryoFX® was contacted for a Design-Build relationship with construction contractor as well as the venue owner and operator. Special effects include water cannons, co2 jets, co2 cannons, custom control panel, and fog machines with custom enclosures to allow operation in outdoor weather.
CryoFX® was contacted for expertise in direction while meeting specific demands in the parameters given for achieved look.
More info to be added with pictures soon.
Â
Date: | November 01, 2021 |
Client: | Tao Beach |
Project: | Las Vegas Day Club (Tao Beach) |
Industry: | Live Entertainment |
Duration: | 5 Months |
Location: | Las Vegas, NV |
Categories: | Custom Products, Custom Systems, All, Sports, Touring |
Commissioned: | April 1, 2022 | April 1, 2022
Scope of Work: | Concept, Design, Build, Install, Consult, Gas Delivery, |
Skills: | shoot the smoke up to 100+ feet in the air |